Purva Cityspire Possession Date
The Purva Cityspire possession date is officially set for December 2030, giving it a clear 4-year building cycle right after its launch in December 2026. Built by Puravankara on 6 acres in Bellandur, East Bengaluru, this housing project brings two high-rise towers with 35 and 38 floors. You can choose from nearly 500 flats across 1, 2, 3, and 4 BHK layouts that range from 700 sq. ft. to 3,200 sq. ft. in size.
Booking early can help you get the starting price before site work moves faster. The project must also follow Karnataka RERA rules. Buyer funds are kept in project bank accounts, while the builder must meet the required project and construction rules before handing over the homes.
Purva Cityspire Possession Schedule & Project Handover Deadlines
The Purva Cityspire possession date of December 2030 is when you get your house keys, right after city engineers check the towers and issue an Occupancy Certificate (OC). The builder divides the work across 48 months to make sure every floor and open green area is fully ready for families to move in.
| Project Detail | Official Project Schedule |
|---|---|
| Official Launch Date | December 2026 |
| Target Possession Date | December 2030 |
| Total Building Window | 48 Months (4 Years) |
| Land Parcel Area | 6 Acres |
| Number of Towers | 2 Tall Towers (35 & 38 Floors) |
| Apartment Sizes | 1, 2, 3, & 4 BHK Units (700 to 3,200 sq. ft.) |
| Total Homes | Around 500 Apartments |
| Legal Delivery Commitment | December 2030 with standard RERA rules |
Tower-Wise Construction Progress and Delivery Phases
Towers 1 and 2 at Purva Cityspire will go up at the same time to ensure all homes are finished before late 2030. Each building phase follows a clear plan, so structural work, wiring, and paint jobs finish without delay.
- Ground Digging and Basements (2027): Workers clear the 6-acre land, dig out two full basement levels, and pour strong concrete slabs for both towers.
- Tower 1 Floor Casting (2028 – 2029): The 35-floor tower rises floor by floor using modern steel forms that speed up concrete drying.
- Tower 2 Floor Casting (2028 – 2029): The 38-floor tower moves up at the exact same pace while teams run heavy water and light lines up the center core.
- Wall Work and Outer Paint (Early 2030): Crews build internal walls, install double-glazed glass windows, put in high-speed lifts, and paint the outside walls.
- Final Flat Checks (Mid 2030 – December 2030): Homeowners walk through their new flats with site engineers to check switches, taps, and tiles before taking the keys.
Karnataka RERA Completion Benchmarks and Possession Protection
Karnataka RERA rules legally bind the builder to hand over your home by December 2030. These simple consumer laws protect your hard-earned money and make sure the builder cannot delay the project without penalty.
- Separate 70% Bank Account: The builder must put 70 paise of every rupee collected into a separate bank account used only for building these towers.
- Regular Web Updates: You can check the official government RERA portal every three months to see real photos and plain facts on site progress.
- Standard 6-Month Buffer: Real estate rules allow a normal 6-month grace period for heavy rains or supply delays before late fees begin.
- Monthly Delay Interest: If the builder finishes past the promised legal date, Section 18 of RERA orders them to pay you monthly interest on your money.
Milestone-Linked Payment Schedule Aligned with Handover
You pay for your home in small steps as each part of the building goes up, rather than giving all your money at once. This standard bank plan protects you because loan funds leave your account only when on-site work is done.
- Token & Booking Advance (10%): You pay a 10% booking fee when you select your flat and sign your initial allotment papers.
- Foundation Pour Stage (15%): Your bank releases this sum once the ground is dug and the basement concrete base is poured.
- Tower Floor Milestones (45%): You pay in four easy parts as the towers cross the 10th, 20th, 30th, and rooftop levels.
- Plaster, Wires, and Tile Work (20%): This payment is due when workers put up room walls, lay down floor tiles, and set up pipes.
- Key Day and Final Letter (10%): You pay the final 10% balance only when the city issues the Occupancy Certificate and gives you your keys.
Pre-Possession Inspection, Snagging, and Key Handover Protocol
Before you take your keys, you get to walk through your entire flat to check that every switch, tap, and door works as promised. You write down any small flaws so the builder can fix them for free before you shift your furniture.
- Room-by-Room Checklist: You inspect every wall, look for paint marks, check floor tiles for cracks, and test all door handles and window latches.
- Water and Power Tests: Site engineers turn on the circuit breakers, plug in test lights, and run all bathroom taps to confirm there are no leaks.
- Quick Fix Window: Puravankara gives you 15 to 30 days while their maintenance team fixes every item on your written list.
- 5-Year Repair Guarantee: Under RERA rules, if a pipe leaks inside a wall or a beam cracks within 5 years of key handover, the builder must fix it at zero cost.
FAQs
The official possession date for Purva Cityspire is December 2030, which gives the builder 4 full years to finish the homes after the December 2026 launch.
RERA allows a standard 6-month grace period for bad weather or material delays, but if delays run longer, the builder must pay you monthly interest.
Buyers get a letter to come and inspect their flats 2 to 3 months before December 2030, once the city grants the official Occupancy Certificate.
You pay through a construction-linked plan, which means the builder only asks for money when specific building steps, like roof slabs or wall plaster, are done.
You will need the Occupancy Certificate (OC), your signed sale deed, the builder possession letter, power meter papers, and advance maintenance slips.